Start with end use, not only product name
Quartz requirements change by process. A tile body brief, float glass brief, and engineered stone brief should not be priced the same way.
- Confirm application first: ceramic body, glass batch, or engineered stone line.
- Ask for chemistry aligned to use, not generic lab values.
- Fix acceptable color and whiteness range before trial quantity.
Lock sizing and consistency before commercial terms
Most trial failures happen due to particle distribution mismatch, not because the product name was wrong.
- Specify required grain/mesh range and tolerance.
- Confirm moisture expectation at dispatch stage.
- Request batch consistency approach for repeat orders.
Align packing and shipment basis early
For import teams, landed performance depends on how material is packed and moved, not only on sample chemistry.
- Confirm 50 Kg vs jumbo bag basis with loading plan.
- Lock shipment basis (FOB/CIF/CNF) in writing.
- Check dispatch timeline against production planning window.